• 尊龙凯时机床

    Hydrolyzed pan waste steam dealing process


    Summary

    The discharge pressure of hydrolyzed is 0.2MPa, the Moisture in furfural scraps is steamed instantly, the process collect waste steam by draught fan and then condensate ,wash and recycle part of furfural in waste steam, and eliminate waste residue flash steam when discharging to improve the production environment.

    Second, the process flow chart:blob.png

    Service hotline: 0538-3399066;0538-3393566;0538-3393266

    Fax: 0538-3399066

    Zip code: 271600

    Address: Feicheng High-tech Industrial Development Zone, Shandong Province




    © 2022 Shandong Jinta Machinery Group Co., Ltd. All rights reserved. 




    技术支持:掘金科技

    WeChat

    WeChat

    WeChat

    WeChat

    Wechat

    Wechat